The ByPass is very hilly with steep climbs going south and is 41 km long.
Construction commenced in 2016, opened to traffic early September 2019.
A few photo taken through the ByPass from inside the vehicle.
At the end of the ByPass there is a service centre, so we stopped for some food, lunch and diesel then moved on.
A farm house and paddocks taken from the vehicle moving south.